Epoxy floor self-leveling paint

A two-component floor topcoat composed of epoxy resin, pigments, additives, solvents and curing agents.

分类:

描述

Epoxy self-leveling floor topcoat
  Product introduction:
  A two-component floor topcoat composed of epoxy resin, pigments, additives, solvents and curing agents.
  Physical parameters:

Technical Specifications All tests (except drying time) are performed after 7 days of curing (25°C)
Pilot projectsunitindex
Dry to the touchh≤4
Time to work hardh≤24
Hardness (Shore D)≥80
Compressive strengthMPA≥80
Bending strengthMPA≥30
Impact resistancekg.cm50
Wear resistance (750g/500r)g≤ 0.02
Adhesion (crosshatch method)class1
Resistant to engine oil and diesel60 daysNo change
Resistant to 10% sulfuric acid20 daysNo significant changes
Resistant to 20% sodium hydroxide30 daysNo significant changes

  Application areas:
  GMP pharmaceutical factories, food factories, hospitals and other dust-free sterile rooms, precision machinery, micro power plant manufacturing plants and other purification areas that have high requirements for comprehensive performance.
  Main features:
  environmentally friendly, non-toxic,
  excellent mechanical properties
  , fast and convenient construction,
  excellent chemical resistance
  , smooth and bright, excellent decorative effect,
  clean up to level 100, dustproof, moisture-proof,
  construction technology:
  1. Construction temperature ≥5℃, if you want to For construction under 5℃, special formula should be used. It is recommended that the humidity be below 75% during construction.
  2. Ensure air circulation during construction. When adjusting the dosage, do not exceed 30 minutes.
  3. Carry out maintenance during the construction process to avoid the intrusion of dust and debris, which may affect the paint surface effect.
  4. After the construction is completed, it needs to be maintained for at least 7 days before it can be put into use. During the maintenance period, it should not be immersed in water or various solutions.
  5. It is strictly prohibited to mix with other paints.
  6. The curing agent must be added in strict accordance with the specified proportion.
  7. Keep the surface of the object to be coated clean, and the moisture content of the object to be coated must be less than 7%.
  8. Keep the painting environment clean, and it is strictly prohibited to perform construction in an environment with a lot of dust.
  Packaging and storage:
  The product should be stored tightly in a cool, dry and ventilated place. The storage period is one year.
  Paint film performance:

serial numberTest itemsstandard requirementtest resultSingle conclusion
1Appearance of paint filmThe appearance of the coating film is normalconform toqualified
2status in containerAfter stirring, there will be no lumps and a uniform state.conform toqualified
3Surface drying time, h ≦44qualified
4Actual drying time, h ≦24twenty fourqualified
5Fully cured, d  ≥77qualified

  Note:
  The actual amount of paint used during painting is 10%-50% higher than the theoretical amount depending on the roughness of the surface to be painted, the thickness of the paint film, and the painting loss.
  Workers at the painting site should wear protective equipment, carefully check for fire and explosion hazards, maintain good ventilation, do not breathe paint mist, and avoid skin contact. If paint splashes on the skin, wash it immediately with suitable detergent, soap and water. , if it splashes into your eyes, rinse with water and treat with medication.
  3. This instruction manual is the accumulation of our tests and experience and can be used as a construction guide. As the product improves, the relevant data may be changed. The latest instruction manual of our company shall prevail without prior notice.