interior wall paint

描述

 Product profile

MQNM-1 inner wall coating is basically composed of water, pigment, emulsion, fillers and various auxiliaries.

application area

Suitable for all kinds of factories and building interior wall decoration.

key property

It has the advantages of tasteless, non-toxic, non-combustible, easy construction, fast drying, good air permeability, strong adhesion, good water resistance, bright color, convenient construction and bright decorative effect.

paint film property

order numberinspecting itemStandard requirementsresultSingle conclusion
1The appearance of the paint filmThe coating was normal in appearanceaccord withqualified
2Status in the containerAfter stirring and mixing, there are no hard block and uniform stateaccord withqualified
3Table shows the drying time, h≤22qualified
4Work time, h≤2424qualified
5adhesion≤22qualified

Construction method
1. Before painting, confirm that the substrate meets the painting requirements;
2. It should be painted between 5~35℃, and the air humidity required for painting should be less than 85%.
3. Choose appropriate construction methods and appropriate construction tools, and carry out construction operations according to recommended construction techniques;
4. Control the painting interval. Only after the recoating time is reached can the next coat of paint be carried out. Recoating time that is too short will cause the base layer to dry slowly.
Problems such as wrinkles may occur; the one-time application should not be too thick.
5. Do not mix with organic solvents, acids, alkalis, oils and other chemicals.
6. Air circulation should be maintained during construction, and the paint should be kept away from direct sunlight and heat sources.
7. To avoid contamination of skin and eyes or inhalation of excessive paint mist, please use protective equipment such as masks and gloves.
8. If the eyes are contaminated, wash them immediately with plenty of water and seek medical treatment.
9. Place it out of reach of children.
Packaging and storage
Pack and store in accordance with national regulations. The storage environment should be dry, cool, well ventilated, avoid high temperatures, and keep away from fire sources. Packaging containers must be kept tightly closed. The effective storage period is 6 months.
Precautions
When the indoor construction substrate temperature is lower than 5℃, it is not suitable for construction.
health and safety
Please pay attention to the warning labels on the packaging containers. Use in a well-ventilated environment. Do not inhale paint mist and avoid skin contact. If paint is spilled on skin, wash immediately with a suitable cleanser, soap and water. If it splashes into your eyes, rinse them thoroughly with water and seek medical treatment immediately.
statement
The information provided in this product data sheet is based solely on our knowledge gained in the laboratory and in practice. However, since the use of products is usually beyond our control, we only guarantee the quality of the product itself. We reserve the right to modify this manual without prior notice.