Epoxy floor sealer primer
Epoxy floor sealing primer is a two-component consisting of epoxy resin, solvent, and additives. Component A, curing agent, and solvent are Component B.
描述
Epoxy sealing primer
Product introduction:
Epoxy floor sealing primer is a two-component consisting of epoxy resin, solvent, and additives. Component A, curing agent, and solvent are Component B.
Physical parameters:
Test items | ||
★Container status | There should be no lumps after mixing | |
★Solid content (after mixing), %,≥ | 35 | |
★Fineness, um≤ | — | |
Applicable period, h≥ | 2 | |
Constructability | Barrier-free construction | |
★Drying time, h≤ | Surface stem | 3 |
★Drying time, h≤ | Hard work | twenty four |
★Viscosity s≥ | 15+5 (paint-4) test original paint | |
Impact resistancecm | — | |
Pencil hardness (scratches) ≥ | — |
Application fields:
Used as a sealing primer on the surface of concrete, wood, terrazzo, steel and other substrates.
Main features:
♦Odorless, high hardness, high penetration, acid and alkali resistance
♦High hardness, reaching 2H
♦Color stability: no color separation during construction
♦Good leveling: no rolling marks when roller coating, no brush marks when brushing
♦It has the advantage of low cost and is mainly used on cement floors.
Construction method:
1. Construction base surface requirements: polished, cleaned and repaired;
2. If the basic surface humidity is >15%, construction must be stopped until the surface humidity is <10%.
can be constructed, otherwise it will easily foam;
3. Operation requirements: Add material B in proportion, stir for about 3 minutes, and then use a roller or flat knife to coat evenly to obtain a smooth and uniform surface coating; 4. Use time limit:
This The product can be used for about 45 minutes at normal temperature. Please determine the amount of ingredients for each batch according to the actual construction progress during use. The prepared materials must be used up at one time, and the remaining materials A and B must be sealed and stored; packaging
and Storage:
Packaging and storage in accordance with national regulations. The storage environment should be dry, cool, well ventilated, avoid high temperatures, and keep away from fire sources. Packaging containers must be kept tightly closed. The effective storage period is 12 months.
Packing specification: 25kg/group
Note:
When the temperature of the outdoor construction substrate is lower than 5℃, the curing reaction of component A/B will slow down or stop, so it is not suitable for construction.
Health and Safety:
Please pay attention to warning labels on packaging containers. Use in a well-ventilated environment. Do not inhale paint mist and avoid skin contact. If paint is spilled on skin, wash away immediately with suitable detergent, soap and water. If it splashes into your eyes, rinse them thoroughly with water and seek medical treatment immediately.
Disclaimer:
The information provided in this product manual is entirely based on our knowledge gained in the laboratory and practice. However, since the use of products is usually beyond our control, we only guarantee the quality of the product itself. We reserve the right to modify this manual without prior notice.